Important
Have the air filter maintenance performed at a ducati dealer or authorised service centre.
Cooling circuit capacity: 2.5 Cu. Dm (litres).
Warning
This operation must be carried out with the engine cold and with the motorcycle vertical and level.
Checking and topping up coolant levelRenewal of the headlight
Disconnect the headlight connectors (a) from the main wiring (refer to the
tables of paragraph "routing of wiring on
frame", sect. 6 - 1).
Loosen nuts (2) that fix the front optical unit to the bottom yoke, and
recover the washers (3).
Remove the complete front optical unit by sliding ...
Routine maintenance record
...
Removal of the lubrication system
Disconnect the sensor (12) of the main wiring.
Open the pipe grommet (11).
Undo the screw (8) and slide out the plate (9).
Slide the tubes (7) out of the half-casing having care not to damage the tubes
o-rings (a) that guarantee the coupling
sealing.
Undo and remove the sc ...